Regulatory Story
Go to market news section View chart   Order free annual report   Print
Company Xstrata PLC
TIDM XTA
Headline Interim Management Statement
Released 07:00 20-Oct-2009
Number 0493B07

RNS Number : 0493B
Xstrata PLC
20 October 2009
 



NEWS RELEASE 


Zug, 20 October 2009


INTERIM MANAGEMENT STATEMENT AND

Q3 PRODUCTION REPORT

Highlights

In the period from 1 July 2009, Xstrata's operating and financial performance continues to be strong and the company's financial position remains robust. Xstrata's preliminary results for the year ending 31 December 2009 will be announced on 8 February 2010.


Xstrata contacts





Investors and analysts

Claire Divver

 

Hanré Rossouw

Telephone:

+44 20 7968 2871

Telephone:

+44 20 7968 2820

Mobile:

+44 7785 964340

Mobile:

+44 7879 455885

Email:

cdivver@xstrata.com

Email:

hrossouw@xstrata.com 





Pamela Bell

 

 

 

Telephone:

+44 20 7968 2822

 

 

Mobile:

+44 7799 626715

 

 

Email:

pbell@xstrata.com 

 

 



This Interim Management Statement has been prepared solely to provide additional information to shareholders as a body to meet the relevant requirements of the UK Listing Authority's Disclosure and Transparency Rules and should not be relied on by any other party or for any other purpose.


About Xstrata plc 

Xstrata is a global diversified mining group, listed on the London and Swiss Stock Exchanges. Headquartered in ZugSwitzerland, Xstrata maintains a meaningful position in seven major international commodity markets: copper, coking coal, thermal coal, ferrochrome, nickel, vanadium and zinc, with a growing platinum group metals business, additional exposures to gold, cobalt, lead and silver, recycling facilities and a suite of global technology products, many of which are industry leaders. The Group's operations and projects span 19 countries.


Q3 2009 PRODUCTION DATA

Xstrata Alloys

Ferrochrome production was 20% lower in the third quarter compared to the same period in 2008, as a result of the ongoing suspension of production capacity in response to market conditions. Production was progressively increased to 60% of total capacity in early July and to approximately 85% by the end of the third quarter in response to improved demand. 

During the third quarter, the Rand continued to strengthen against the US dollar and is currently trading near to a 14 month high. The strong Rand has resulted in margins remaining under pressure and subsequently ferrochrome producers have achieved a 16% increase in pricing. The European benchmark ferrochrome price was settled at $1.03 per pound for the fourth quarter, up from $0.89 in the previous quarter. 


Production was suspended at Rhovan, Xstrata's integrated vanadium operation, during the third quarter for extended maintenance. The operation returned to full production on 17 October. 

PGM volumes were 5% higher than the same period last year, as the Mototolo Joint Venture is now producing at a steady state of 209,500 ounces per annum (100% basis).  The Eland operation has commenced the development of an underground mine, which will replace its opencast tonnage and progressively increase current PGM production levels to up to 300,000 platinum ounces per annum from 2014.



Chrome


Q3 2009

Q3 2008

Nine months
to

30.09.09

Nine months
to

30.09.08

Attributable* saleable production (kt)

245

308

489

923

Indicative average published price (US¢/lb) (Metal Bulletin)

89

205

79

173

* Reflects Xstrata's 79.5% share of the Xstrata-Merafe Chrome Venture



Vanadium


Q3 2009

Q3 2008

Nine months
to

30.09.09

Nine months
to

30.09.08

Consolidated* saleable ferrovanadium production (k kg)

-

1,026

1,313

2,554

Consolidated* saleable vanadium pentoxide (k lb)

-

4,803

7,039

11,730

Indicative average published price ferrovanadium (US$/kg) (Metal Bulletin)

31.52

64.11

25.52

68.42

Indicative average published price vanadium pentoxide (US$/lb) (Metal Bulletin)

6.71

15.74

5.70

14.82

* Consolidated 100%


  



Platinum Group Metals 


Q3 2009

Q3 2008

Nine months
to

30.09.09

Nine months
to

30.09.08

Consolidated** saleable production (oz)





Platinum

36,506 

36,250

100,014

100,767

Palladium

18,605 

16,818

50,328

47,444

Rhodium

5,974 

4,850

15,775

12,906

Average prices ($/oz)





Average (London Platinum and Palladium Market) Platinum price ($/oz)

1,232

1,542

1,142

1,822

Average (London Platinum and Palladium Market) Palladium price ($/oz)

272

331

235

407

Average (Johnson Matthey) Rhodium price ($/oz)

1,603

6,831

1,372

8,167

** Consolidated 100% of Eland and 50% of Mototolo

  Xstrata Coal 

In the third quarter of 2009, Xstrata Coal's total consolidated production of 25.6 million tonnes was up by 2.1 million tonnes or 9% on the same period in 2008.  

Total thermal coal volumes increased by 8% on the comparable period in 2008, mainly as a result of the inclusion of the recently acquired Prodeco operation.  

Production from the South African operations was 8% lower on the comparable period in 2008, due to the planned shutdown of Impunzi Underground and reduced demand for unwashed coal in the domestic market. Lower demand for export thermal coal in the Atlantic coal market led to cut backs in higher cost production and also constrained Colombian production. 

Semi-soft coking increased by 21% period-on-period due to the New South Wales operations switching from thermal production to higher-priced semi-soft production. 

Production of Australian coking coal increased by 11% in the third quarter compared to the same period in 2008, through increased productivity at Oaky North and the recommencement of the Oaky No.1 longwall in August 2009. 



Production Data


Q3 2009

Q3 2008

Nine months
to

30.09.09

Nine
months

to

30.09.08

Total consolidated production (million tonnes)

25.6

23.5

69.4

63.1

Total thermal coal

21.9

20.3

60.9

53.4

Australian thermal

11.1

11.4

29.9

28.3

South African thermal*

5.6

6.1

15.4

17.1

Americas thermal**

5.2

2.8

15.6

8.0

Total coking coal (Australia)

2.0

1.8

4.2

5.0

Total semi-soft coking coal (Australia)

1.7

1.4

4.3

4.7

Average received export FOB coal price ($/t)





Australian thermal

73.8

107.6

83.4

89.6

South African thermal

67.6

87.4

69.0

79.9

Americas thermal

72.9

86.0

75.5

76.2

Australian coking

150.9

313.8

145.7

208.3

Australian semi-soft coking

83.3

245.8

135.3

149.0

* For production reporting DTJV is included for the first nine months. For financial reporting DTJV will be excluded from Xstrata Coal's ex-mine results as a result of the DTJV re-structuring announced on 3 March 2008. 

** The Prodeco operations have been included for the full 9 months to September 2009. Americas thermal average received export price assumes all production from Prodeco is sold.


  

Xstrata Copper

Mined copper production was 10% lower in the third quarter than the same period in 2008, as a result of lower grades which impacted volumes at Alumbrera, Antamina and Ernest Henry. Large volumes of lower grade stockpiles supplemented ore feed at Ernest Henry, where access to high grade areas has been delayed following the record wet season early in the year and ongoing impacts from geotechnical events in 2008.  

Production at Mount Isa increased, where higher grade stopes compensated for lower hoist tonnes. At Collahuasi, capacity improvements at the concentrator and the filter plant contributed to increased volumes compared to the same period last year. However the full impact of the expansions was offset by a 45-day outage of the ore feed conveyor following damage to the main electrical substation sustained in July. Cathode production increased by 27% at Lomas Bayas following the completion of an expansion at the end of 2008.

Total refined copper production, including third party metal, decreased by 15% following the temporary shutdown of Kidd Metallurgical in September in response to a shortage of third party copper concentrate and strike action at a main feed source supplier for the CCR refinery. This was partially offset by the higher tonnage of custom anode treated at the Townsville refinery and improved Altonorte performance compared to the third quarter of 2008 when the No. 2 acid plant was decommissioned.  



Production Data


Q3 2009

Q3 2008

Nine months
to

30.09.09

Nine months
to

30.09.08

Total mined copper production (t) (contained metal)

212,173

234,615

659,682

674,999

Total mined gold production (oz) (contained metal)

99,336

141,478

394,195

473,166

Total copper cathode (t) (from mined and third party material)

181,318

212,635

542,267

626,642

Average LME copper price (US$/t)

5,859

7,680

4,650

7,973

Average LBM gold price (US$/t)

960

869

930

898



  Xstrata Nickel

Total mined nickel production in the third quarter of 2009 remained at a similar level to the same period in 2008. Production at Raglan increased by 12% on the corresponding period in 2008, and improved grades and increased ore production more than doubled volumes at Xstrata Nickel Australasia (XNA). Production of high-grade ores began at the new, negative-cash-cost Nickel Rim South, which is on track to ramp up to 60% of full annual capacity by the end of 2009. These positive improvements in volumes at lower cost operations offset the impact of the restructuring of the Sudbury operations in early 2009, which included the closure of two high-cost, end-of-life mines and the suspension of the Fraser Mine complex. Montcalm was also indefinitely suspended in June, due to an unacceptable risk profile following unplanned ground movement.  

Refined nickel production from Nikkelverk increased by 4% during the quarter compared to the corresponding period in 2008 as reduced third-party feed volumes were largely offset by increased mined production from Canadian and Australian operations. 

The Falcondo ferronickel operation in the Dominican Republic remains on care and maintenance.

Total mined copper production in the third quarter was 52% lower compared to the same period last year due to the closure of high copper-containing nickel mines in Sudbury and Timmins, although this was partially offset by increased volumes from XNA.



Production Data


Q3 2009

Q3 2008

Nine months
to

30.09.09

Nine months
to

30.09.08

Total mined nickel production (t) (contained metal)

13,418

13,620

41,923

40,230

Total mined copper production (t) (contained metal)

3,297

6,935

15,167

22,150

Total mined cobalt production (t) (contained metal)

286

323

1,051

1,006

Total refined nickel production (t) (payable metal)*

23,504

22,621

65,476

66,195

Total mined ferronickel production (t) (contained metal)

-

4,387

-

18,782

Average LME nickel price(US$/t)

17,694

18,961

13,692

24,533

Average LME copper price (US$/t)

5,859

7,680

4,650

7,973

Average Metal Bulletin cobalt low grade price (US$/lb)

16.83

31.65

14.25

40.86

* Excludes payable nickel in ferronickel production in 2008.

  Xstrata Zinc

Zinc in concentrate production increased by 10% in the third quarter compared to the same period in 2008, as a result of improved productivity at the new Perseverance mine in Canada and at the Australian operations following their restructuring and expansions in the first half of the year. 

Total zinc metal production remained consistent with the comparable period in 2008. An 8% increase in production at the San Juan de Nieva smelter was largely offset by lower production at the Nordenham, Kidd Creek and CEZinc smelters, where production was curtailed in response to constraints created by lower sulphuric acid demand and planned reductions to optimise power costs.

Lead in concentrate production was 5% lower than the same period last year mainly as a result of lower lead recoveries at Brunswick mine. Lead metal production was 17% higher, reflecting a continuous supply of crude lead at Northfleet refinery compared to the prior period.



Production Data


Q3 2009

Q3 2008

Nine months
to

30.09.09

Nine months
to

30.09.08

Total zinc in concentrate production (t)

265,638

241,881

759,443

622,659

Total zinc metal production (t)

210,035

208,818

611,288

620,761

Total lead in concentrate production (t) 

61,239

64,392

171,324

192,145

Total lead metal production (t)

54,300

46,273

176,119

159,745

Average LME zinc price (US$/t)

1,757

1,773

1,472

2,101

Average LME lead price (US$/t)

1,937

1,913

1,537

2,366




Ends


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSEAEENFLANFAE
Close
London Stock Exchange plc is not responsible for and does not check content on this Website. Website users are responsible for checking content. Any news item (including any prospectus) which is addressed solely to the persons and countries specified therein should not be relied upon other than by such persons and/or outside the specified countries. Terms and conditions, including restrictions on use and distribution apply.

Regulatory